Other Completed Projects

Name of Client / Projects System Engineer / Architect Project Period
Edwards Life Sciences World Trade Corporation Office Air-Cooled Split Units Design & Built 11/02
Chaya Mata Sarawak Bhd, Head Office (Menara Maxis, Level 33) Chilled Water Fan Coil Units Design & Built February ~ April 2003
Security & Surau at Menara Maxis CM & CC Level Air-Cooled Split Units Design & Built May ~ June 2003
Goldcold Transport Sdn. Bhd., cold storage office Air-Cooled Split Units, Ductwork Perunding Unireka March ~ August 2003
Mulberry Estate Sdn. Bhd. Air-cooled Split Units, Ductworks HPS Consult Sdn. Bhd. April 03 ~ Jan 2004
SEMA Powder Booth Room ACMV Upgrading Works Air-cooled Split Units,Ductworks Design & Built February ~ March 2004
Menara Maxis – Level 41 ( Installation Additional Air-cond in server room ) Chilled Water FCU, Ductworks Design & Built 04/04
Menara Maxis – Level 4 ( Installation Additional Air-cond in server room ) Chilled Water FCU, Ductworks Design & Built July ~ September 2004
eP2M Sdn. Bhd. factory A/C renovation works Air-cooled Split Units, Ductworks Design & Built June ~ September 2004
MFS Technology (M) Sdn. Bhd – Process Cooling System 65RT Water-Cooled Chiller, Process cooling, Ductworks Design & Built June ~ August 2004
Dutch Lady Factory, Petaling Jaya – Air-conditioning upgrading works for milk powder packaging area Relocation of equipment, Ductworks Design & Built 10/04
SEMA MGT Factory Extension Project at Klang / Samsung Electronics (M) Sdn. Bhd. DX AHU w/condensing units, water-cooled package units, air-cooled split units, ductworks & pipeworks Design & Built Nov 2004 ~ Feb 2005
Sapura Resources Berhad – Return Duct System At GFSapura@Mines Air side of AC system Design & Built 12/04
Podoyo Plastics Industries Industries – Smoke Extraction System Smoke Extraction System Design & Built Dec 2004 ~ Feb 2005
Embassy Court Sales & Marketing Office Renovation at Petronas Tower 2 Level 54 Relocation of Air Diffusers. Engineering and Environmental Consultant Sdn. Bhd. March ~ April 2005
Syarikat Pembenaan Yeoh Tiong Lay Sdn. Bhd. – Performing Art Theatre at Sentul West Air Conditioning Project 2 x 200 RT Air-Cooled Chillers (Sub-contract of project management, Engineering works, testing and commissioning & supply of fans and pump) Norman Disney & Young Sdn. Bhd. July 2004 ~ Aug 2005
eP2M Sdn. Bhd. factory A/C renovation works — Phase 2 Air-cooled Split Units, Ductworks Design & Built September
Bumi Armada Office Renovation at Menara KUB.Com Air-Cooled Split Units Design & Built July ~ November 2005
SEMA Exhaust Table Additional Air Conditioning Works. Air-Cooled Split Units Design & Built September ~ October 2005
SEMA MGT Factory Extension Project at Klang / Samsung Electronics (M) Sdn. Bhd. — Phase 2 Exhaust fans c/w ductwork & air-cooled split units c/w ductworks Design & Built June 2005 ~ Dec 2005
Menara Maixs Level 5 Telelink Office Server Room Air Conditioning work Chilled Water FCU, Ductworks Design & Built Dec 2005 ~ Jan 2006
Bintang Palace – Chiller Plant Room Automation System Install Chiller Plant Room Automation System Design & Built May 2006 ~ Aug 2006
Design Work for OXY Qatar PS1M Living Quarter Chiller System Off-Shore Platform Design Project Aug 2006 ~ Dec 2006
Puteri Park Hotel – Air Conditioning Works Additional Chiller, Pumps, Cooling Tower, Pipework & Ductworks Design & Built Sep 2006 ~ Dec 2007
Bintang Palace – Air-Cond Renovation Works for GF VIP Rooms Chilled Water FCU, Ductworks Design & Built Dec 2006 ~ Mar 2007
Samsung New Call Centre – Air-Cond Renovation Works Air-Cooled Split Units and Ductworks. Design & Built May 2007 ~ Sep 2007
Samsung Display (M) Sdn Bhd – Energy Saving Project Installation of Chiller and Ductworks Samsung Engineering (M) Sdn Bhd Jan 2007 ~ Nov 2007
Relocation of Air-cooled Split Unit at SEMA Factory Air-Cooled Split Unit Design & Built 12/07
KL Pavilion – Labour  To Replace Sensors Chiller Control System York (M) Sales & Service Sdn Bhd 02/08
SME KL Sentral Office – Air-Cond Renovation Works Air-Cooled Split Units and Ductworks. Design & Built Oct 2007 ~ March 2008
Sunway University College – Air-Cond Renovation Works Chilled Water FCU and Ductworks Design & Built Jul 2007 ~ Jul 2008
6.6 KV Switchgear at Sg. Semenyih , Putrajaya Air-Cooled Split Units and CO2 System Renovation Works. Design & Built Feb 2008 ~ Jul 2008
Samsung Coil Centre Office Renovation at Port Klang Air-Cooled Split Unit Design & Built May 2008 ~ July 2008
Call Centre for SRG Asia Pacific at Setapak Air-Cooled Split Units and Ductworks. Perunding Shanu Sdn Bhd Nov 2008 ~ Jan 2009
IPP Bahau – Small Renewable Energy Power Plant, Air Conditioning Works Air-Cooled Split Units and Ventilation Fans Design & Built May 2007 ~ May 2009
Shangri-La Hotel – First Floor Pub Renovation Chilled water and ductworks Juaraconsult Sdn Bhd Oct 2010 ~Dec 2010
Radius Hotel – Refurbishment of Chiller Refurbishment of water-cooled chiller Direct 07/11
KLCC Suria Solar Inverter Room Air-cooled split system Design & Built July 2011 ~Aug 2011
Kompleks Mahkamah Syariah Negeri Selangor at Shah Alam VRV, piping & ducting supply & installation works Jureka Consulting May 2009 ~ Dec 2011
KL Kepong – Davos Plant Water-cooled chiller system Perunding Unireka / Design & Built Jan 2012 ~July 2012
PPB Oil Palms, PPB Group, Kuok Brothers & Kouk Foundation Office Renovation Works at UBN Tower Ductworks and Controls Juaraconsult Sdn Bhd / Design & Built June 2012 ~ October 2012
TPM – Incubation Center Renovation at L2 AHU & Precision Air-conditioning Perunding Azfar Jul 2013 ~ Oct 2013
Lembaga Tabung Haji – IFIC, Jalan Tun Razak Renovation Air-cooled Split Units System Perunding JYS Sdn Bhd Sep 2013 ~ April 2014
Ong Chong Realty – Residence 8 condominium Air-Cooled Split Units & Car Park Mechanical Ventilation, Pressurization & Smoke Exhaust System Juaraconsult Sdn Bhd Feb 2012 ~ June 2014
Metro Hotel Kajang – MKH Hybrid Chillers and Chilled Water System Design & Built Mar 2015 ~ May 2015
Sibelco Lab @ Luxor Tech Center Ducted ACSU System Design & Built June 2015 ~ Sept 2015
Swiss Inn, Johor Bharu VRF, Air-Cooled Split Units, Mechanical Ventilation, Pressurization & Smoke Exhaust System KWA Consult Sdn Bhd June 2014 ~ Oct 2015