| Name of Client / Projects | System | Engineer / Architect | Project Period |
|---|---|---|---|
| Edwards Life Sciences World Trade Corporation Office | Air-Cooled Split Units | Design & Built | 11/02 |
| Chaya Mata Sarawak Bhd, Head Office (Menara Maxis, Level 33) | Chilled Water Fan Coil Units | Design & Built | February ~ April 2003 |
| Security & Surau at Menara Maxis CM & CC Level | Air-Cooled Split Units | Design & Built | May ~ June 2003 |
| Goldcold Transport Sdn. Bhd., cold storage office | Air-Cooled Split Units, Ductwork | Perunding Unireka | March ~ August 2003 |
| Mulberry Estate Sdn. Bhd. | Air-cooled Split Units, Ductworks | HPS Consult Sdn. Bhd. | April 03 ~ Jan 2004 |
| SEMA Powder Booth Room ACMV Upgrading Works | Air-cooled Split Units,Ductworks | Design & Built | February ~ March 2004 |
| Menara Maxis – Level 41 ( Installation Additional Air-cond in server room ) | Chilled Water FCU, Ductworks | Design & Built | 04/04 |
| Menara Maxis – Level 4 ( Installation Additional Air-cond in server room ) | Chilled Water FCU, Ductworks | Design & Built | July ~ September 2004 |
| eP2M Sdn. Bhd. factory A/C renovation works | Air-cooled Split Units, Ductworks | Design & Built | June ~ September 2004 |
| MFS Technology (M) Sdn. Bhd – Process Cooling System | 65RT Water-Cooled Chiller, Process cooling, Ductworks | Design & Built | June ~ August 2004 |
| Dutch Lady Factory, Petaling Jaya – Air-conditioning upgrading works for milk powder packaging area | Relocation of equipment, Ductworks | Design & Built | 10/04 |
| SEMA MGT Factory Extension Project at Klang / Samsung Electronics (M) Sdn. Bhd. | DX AHU w/condensing units, water-cooled package units, air-cooled split units, ductworks & pipeworks | Design & Built | Nov 2004 ~ Feb 2005 |
| Sapura Resources Berhad – Return Duct System At GFSapura@Mines | Air side of AC system | Design & Built | 12/04 |
| Podoyo Plastics Industries Industries – Smoke Extraction System | Smoke Extraction System | Design & Built | Dec 2004 ~ Feb 2005 |
| Embassy Court Sales & Marketing Office Renovation at Petronas Tower 2 Level 54 | Relocation of Air Diffusers. | Engineering and Environmental Consultant Sdn. Bhd. | March ~ April 2005 |
| Syarikat Pembenaan Yeoh Tiong Lay Sdn. Bhd. – Performing Art Theatre at Sentul West Air Conditioning Project | 2 x 200 RT Air-Cooled Chillers (Sub-contract of project management, Engineering works, testing and commissioning & supply of fans and pump) | Norman Disney & Young Sdn. Bhd. | July 2004 ~ Aug 2005 |
| eP2M Sdn. Bhd. factory A/C renovation works — Phase 2 | Air-cooled Split Units, Ductworks | Design & Built | September |
| Bumi Armada Office Renovation at Menara KUB.Com | Air-Cooled Split Units | Design & Built | July ~ November 2005 |
| SEMA Exhaust Table Additional Air Conditioning Works. | Air-Cooled Split Units | Design & Built | September ~ October 2005 |
| SEMA MGT Factory Extension Project at Klang / Samsung Electronics (M) Sdn. Bhd. — Phase 2 | Exhaust fans c/w ductwork & air-cooled split units c/w ductworks | Design & Built | June 2005 ~ Dec 2005 |
| Menara Maixs Level 5 Telelink Office Server Room Air Conditioning work | Chilled Water FCU, Ductworks | Design & Built | Dec 2005 ~ Jan 2006 |
| Bintang Palace – Chiller Plant Room Automation System | Install Chiller Plant Room Automation System | Design & Built | May 2006 ~ Aug 2006 |
| Design Work for OXY Qatar PS1M Living Quarter | Chiller System | Off-Shore Platform Design Project | Aug 2006 ~ Dec 2006 |
| Puteri Park Hotel – Air Conditioning Works | Additional Chiller, Pumps, Cooling Tower, Pipework & Ductworks | Design & Built | Sep 2006 ~ Dec 2007 |
| Bintang Palace – Air-Cond Renovation Works for GF VIP Rooms | Chilled Water FCU, Ductworks | Design & Built | Dec 2006 ~ Mar 2007 |
| Samsung New Call Centre – Air-Cond Renovation Works | Air-Cooled Split Units and Ductworks. | Design & Built | May 2007 ~ Sep 2007 |
| Samsung Display (M) Sdn Bhd – Energy Saving Project | Installation of Chiller and Ductworks | Samsung Engineering (M) Sdn Bhd | Jan 2007 ~ Nov 2007 |
| Relocation of Air-cooled Split Unit at SEMA Factory | Air-Cooled Split Unit | Design & Built | 12/07 |
| KL Pavilion – Labour To Replace Sensors | Chiller Control System | York (M) Sales & Service Sdn Bhd | 02/08 |
| SME KL Sentral Office – Air-Cond Renovation Works | Air-Cooled Split Units and Ductworks. | Design & Built | Oct 2007 ~ March 2008 |
| Sunway University College – Air-Cond Renovation Works | Chilled Water FCU and Ductworks | Design & Built | Jul 2007 ~ Jul 2008 |
| 6.6 KV Switchgear at Sg. Semenyih , Putrajaya | Air-Cooled Split Units and CO2 System Renovation Works. | Design & Built | Feb 2008 ~ Jul 2008 |
| Samsung Coil Centre Office Renovation at Port Klang | Air-Cooled Split Unit | Design & Built | May 2008 ~ July 2008 |
| Call Centre for SRG Asia Pacific at Setapak | Air-Cooled Split Units and Ductworks. | Perunding Shanu Sdn Bhd | Nov 2008 ~ Jan 2009 |
| IPP Bahau – Small Renewable Energy Power Plant, Air Conditioning Works | Air-Cooled Split Units and Ventilation Fans | Design & Built | May 2007 ~ May 2009 |
| Shangri-La Hotel – First Floor Pub Renovation | Chilled water and ductworks | Juaraconsult Sdn Bhd | Oct 2010 ~Dec 2010 |
| Radius Hotel – Refurbishment of Chiller | Refurbishment of water-cooled chiller | Direct | 07/11 |
| KLCC Suria Solar Inverter Room | Air-cooled split system | Design & Built | July 2011 ~Aug 2011 |
| Kompleks Mahkamah Syariah Negeri Selangor at Shah Alam | VRV, piping & ducting supply & installation works | Jureka Consulting | May 2009 ~ Dec 2011 |
| KL Kepong – Davos Plant | Water-cooled chiller system | Perunding Unireka / Design & Built | Jan 2012 ~July 2012 |
| PPB Oil Palms, PPB Group, Kuok Brothers & Kouk Foundation Office Renovation Works at UBN Tower | Ductworks and Controls | Juaraconsult Sdn Bhd / Design & Built | June 2012 ~ October 2012 |
| TPM – Incubation Center Renovation at L2 | AHU & Precision Air-conditioning | Perunding Azfar | Jul 2013 ~ Oct 2013 |
| Lembaga Tabung Haji – IFIC, Jalan Tun Razak Renovation | Air-cooled Split Units System | Perunding JYS Sdn Bhd | Sep 2013 ~ April 2014 |
| Ong Chong Realty – Residence 8 condominium | Air-Cooled Split Units & Car Park Mechanical Ventilation, Pressurization & Smoke Exhaust System | Juaraconsult Sdn Bhd | Feb 2012 ~ June 2014 |
| Metro Hotel Kajang – MKH | Hybrid Chillers and Chilled Water System | Design & Built | Mar 2015 ~ May 2015 |
| Sibelco Lab @ Luxor Tech Center | Ducted ACSU System | Design & Built | June 2015 ~ Sept 2015 |
| Swiss Inn, Johor Bharu | VRF, Air-Cooled Split Units, Mechanical Ventilation, Pressurization & Smoke Exhaust System | KWA Consult Sdn Bhd | June 2014 ~ Oct 2015 |